• Description

    During the modernisation of the water supply network in Łódź we had to use 250 m of the pipeline in the circular section tunnel (170 cm in diameter) to pump 30 cm of concrete with the object of widening the water conduct. This tunnel was 800 m in length.

    Technical data

    Country:

    Poland

    Type of construction:

    Civil

    Segment type:

    Hydraulic works

    Year:

    2010

    Cubic meters:

    20.000

  • Description

    The Sky Tower is the tallest building in Poland. It is 250 m high. To pump the concrete for the walls and the elevator shafts we had to use, further to the pump, a hydraulic distributing lever.

    Technical data

    Country:

    Poland

    Type of construction:

    Non-residential

    Segment type:

    Administrative centers

    Year:

    2009 / 2010

    Cubic meters:

    25.000

  • Description

    The national music forum will be a cultural and musical center. The idea of this project is to create a site where you can go to the philharmonic, the orchestra, the opera or the theatre. The plan is that this building starts working in 2013.

    Technical data

    Country:

    Poland

    Type of construction:

    Non-residential

    Segment type:

    Administrative centers

    Year:

    2010 / 2011 / 2012 / 2013

    Cubic meters:

    165.000

  • Description

    Reconstruction of the old railway station in Wrocław and all the technical infrastructure. The objective of this project is to restore the station’s look before the war. The station has to work during this work. We have to use the 200 m long pipe to supply concrete from the entrance to the platforms.

    Technical data

    Country:

    Poland

    Type of construction:

    Civil

    Segment type:

    Railways

    Year:

    2010 / 2011 / 2012

    Cubic meters:

    80000

  • Description

    This major work of infrastructure starts near Vila Real and develops at a distance of 120 km up to Bragança. It consists of a diverse set of viaducts, unevenness and hydraulic steps, of which to be pointed out the great Corgo viaduct due to its length and height.

    Eight pumps will be participating in all these works, of which four with a 42-meter boom.

    Technical data

    Country:

    Portugal

    Type of construction:

    Civil

    Segment type:

    Roads

    Year:

    2010 / 2011 / 2012

    Cubic meters:

    380.000

  • Description

    This work consists of a road that develops to the North of the famous Marão tunnel, thus enabling the link between the IP4 and the Via Transmontana (Transmontana road). The work consists of five viaducts, of which two to be pointed out due to their size; the viaduct near Amarante and the viaduct over the Sorgo.

    In these last two, the pumping was carried out using stationary equipment and pipe.

    Technical data

    Country:

    Portugal

    Type of construction:

    Civil

    Segment type:

    Roads

    Year:

    2011 / 2012

    Cubic meters:

    170.000

  • Description

    The construction of the LNG liquid gas terminal in Świnoujście is the first investment of this type not only in Poland but in this part of Europe.

    From September 18 to December 6, 2011 our company took part in the construction of 2 gas tanks (42 m height and 80 m in diameter). In total we pumped around 17.000 m3 of concrete.

    Technical data

    Country:

    Poland

    Type of construction:

    Civil

    Segment type:

    Hydraulic works

    Year:

    2011

    Cubic meters:

    17.000

  • Description

    The construction of the A1 highway is a very important investment for transport in Poland.

    In the future this highway will run from the North of Poland to the border of the Czech Republic. We took part in the construction of two fragments, stretch nr. III (Piekary Śląskie – Maciejów) and stretch nr. IV (Pyrzowice – Piekary Śląskie).

    Technical data

    Country:

    Poland

    Type of construction:

    Civil

    Segment type:

    Roads

    Year:

    2011 / 2012

    Cubic meters:

  • Description

    Este trabajo consistió en la reestructuración de la ZonaSul del Tejo, conexión Trafaria / Barreiro. En este trabajo Gebomsa participó en el bombeo del viaducto de Coina (80.000m3), y los viaductos de Belverde y  Palhais (40.000m3).

    Technical data

    Country:

    Portugal

    Type of construction:

    Civil

    Segment type:

    Roads

    Year:

    2010 / 2011 / 2012

    Cubic meters:

    120.000

  • Description

    This work consisted of the roadway restructuring of 270 km, of which 240 km were made new. Developed in the area of Trás-os-Montes, this work was carried out by sections. The pumping work coincided with the construction of viaducts and passages to unevenness and several minor infrastructure.

    This work was completed in January 2012.

    Technical data

    Country:

    Portugal

    Type of construction:

    Civil

    Segment type:

    Roads

    Year:

    2010 / 2011 / 2012

    Cubic meters:

    130.000