• Description

    “Renato Poblete” River Park involves the construction of 3 2-metre high rubber dams (inflatable or deflatable according to the flow of the river) on the Mapocho river bed and perpendicular to the latter, in order to form 3 lakes. In addition to this, a park with an area of 20 hectares will be built, incorporating the river channel to form a 7 Ha lake for water sports, with two islands interconnected by bridges.

    Technical data

    Country:

    Chile

    Type of construction:

    Civil

    Segment type:

    Hydraulic works

    Year:

    2013 / 2014

    Cubic meters:

    7.000

  • Description

    Concrete Pumping by static equipment. The static equipment was located at level 0, through tow lines of horizontal and vertical pipe, connected to the hydraulic distributor dealers, first with a range of 30m, and the other one with 32m, installed, each on shafts lattice of 30 and 15 m. According to this , we can pump up to level 0 as the peak height.

    Technical data

    Country:

    Switzerland

    Type of construction:

    Non-residential

    Segment type:

    Shopping malls

    Year:

    2010 / 2011 / 2012 / 2013

    Cubic meters:

    120.000

  • Description

    Concrete Pumping by static equipment. The static equipment was located at level 0, through horizontal and vertical pipe connected to the hydraulic distributor installed at the climbing system, this way, the distributor raises with this system 180 meters.

    Technical data

    Country:

    Spain

    Type of construction:

    Non-residential

    Segment type:

    Administrative centers

    Year:

    2011 / 2012

    Cubic meters:

    15.000

  • Description

    Concrete Pumping and static pipe bomb for paving 30 cm high in a tunnel beneath the river Vistula. The tunnel was 1,300 m in length, so pumping was conducted in two phases, the first a part of the river with a 700m line and another from the other side of the river with 600m of pipe.

    Technical data

    Country:

    Poland

    Type of construction:

    Civil

    Segment type:

    Hydraulic works

    Year:

    2012

    Cubic meters:

    2.500

  • Description

    The construction of the Las Cancelas Shopping Center was resumed in 2011 and in a six-month period we had to pump more than 30,000 m3 of concrete in paving, foundations and structures, plans with more than 1.500 m2 of reticular floor at one time, a majestic shopping center in the area La Puerta del Camino de Santiago de Compostela.

    Technical data

    Country:

    Spain

    Type of construction:

    Non-residential

    Segment type:

    Shopping malls

    Year:

    2011

    Cubic meters:

    32.500

  • Description

    The shopping and leisure center El Rosal is the first shopping center of Ponferrada, located in the residential area of La Rosaleda with 143 stores and with 2.500 free parking spaces. El Rosal has more than 49.000 m2 distributed in fashion shops, restaurants, movie theatres and various entertainment venues.

    Technical data

    Country:

    Spain

    Type of construction:

    Non-residential

    Segment type:

    Shopping malls

    Year:

    2006 / 2007

    Cubic meters:

    60.000

  • Description

    These are the construction works of the so-called Valladolid railway complex, located in the Páramo of San Isidro and which will host the current Renfe-Integria workshops and other facilities such as the new goods station, the Technology Center of Vía y Redalsa. The UTE Valladolid railway complex is formed by the companies Comsa, Collosa and Cycasa, with a budget of 140 million euros.

    Technical data

    Country:

    Spain

    Type of construction:

    Civil

    Segment type:

    Railways

    Year:

    2010 / 2011

    Cubic meters:

    50.000

  • Description

    The new bridge over the Ricobayo dam is located between the municipalities of Manzanal del Barco and Palacio del Pan in Zamora. The new infrastructure, carried out by FCC, has a length of 479,25 m and is built a few meters from the old bridge of Manzanal that dates of the thirties and is closed to traffic due to major damage to its structure.

    Technical data

    Country:

    Spain

    Type of construction:

    Civil

    Segment type:

    Roads

    Year:

    2006

    Cubic meters:

    7.000

  • Description

    The works of the A.V.E between Villaverde and Villafranca consisted of building a platform of 32,2 km length and 14 meters width, with capacity for a double track so that the trains may move to a maximum of 350 kilometers per hour. This is the stretch of highest amount, running between the townships of Villaverde de Medina and Villafranca del Duero, in the province of Valladolid, awarded to the company Acciona Infrasestructuras with a budget of 105,8 million Euros.

    Technical data

    Country:

    Spain

    Type of construction:

    Civil

    Segment type:

    Railways

    Year:

    2011 / 2012

    Cubic meters:

    55.000

  • Description

    The parking located in the seminary of the Rondilla will have 890 parking places available. This will be the largest car park built in the city so far, located in the courtyard of the seminary, at the confluence of Mirabel with Tirso de Molina. The garage will have one entry and exit for vehicles and four for pedestrians, all in Mirabel. The three basements will each have a surface of 6.589 square meters.

    Technical data

    Country:

    Spain

    Type of construction:

    Non-residential

    Segment type:

    Parking’s

    Year:

    2006

    Cubic meters:

    5.000

  • Description

    Highway VA-30. Outer Round East of Valladolid. Stretch: Autovía del Duero (A-11) – Autovía of Castile (A-62), at a 22.5 kilometers distance from this new ring road and with a budget of 96.577.560 € . The infrastructure will involve the construction of two new bridges to save the Pisuerga in Arroyo, where the VA-30 starts, and between the exits of the A-62 up to Cigales and Cabezón, where it leads into.

    Technical data

    Country:

    Spain

    Type of construction:

    Civil

    Segment type:

    Roads

    Year:

    2010 / 2011

    Cubic meters:

    15.000

  • Description

    Pumping of concrete by static equipment of paving stones, walls, screens, forgings, cells, roofs, beams and other parameters that form the structure of the tank. There are four pumping devices each comprised of 1 static machine, linear pipeline and a stylus of 32 m of R, mounted on shafts of lattice on a platform of rails that allows horizontal movement in the distribution tower to give complete pumping coverage.

    Technical data

    Country:

    Spain

    Type of construction:

    Civil

    Segment type:

    Hydraulic works

    Year:

    2006 / 2007

    Cubic meters:

    80.000

  • Description

    Pumping of concrete by stationary equipment for a 80 m high tower. For this tower, at an altitude 48 over the top of the two inner walls, an adaptation platform is installed with 4 sections of stems over which we incorporated a stylus of 20m, giving total coverage of the pumping up to the final height of the tower.

    Technical data

    Country:

    Spain

    Type of construction:

    Civil

    Segment type:

    Power plants

    Year:

    2011

    Cubic meters:

    500

  • Description

    Pumping of concrete by static equipment. At level 0 we located the stationary pumping equipment, and through a horizontal and vertical pipeline we connected it to the stylus installed at the ccostumer (REPSOL, CRISTAL) independent climbing system (ESPACIO) reaching heights of up to 250 m. Thus we adapt the typology to costumer in concrete of towers structure.

    Technical data

    Country:

    Spain

    Type of construction:

    Non-residential

    Segment type:

    Administrative centers

    Year:

    2006 / 2007 / 2008

    Cubic meters:

    60.000

  • Description

    The structure of the tank rises through a climbing platform system, by which we placed 3 42 booms on shafts we connected each one to its stationary pumping equipment, so that as the height of the wall of the tank increases, we incorporated new stretches of shaft to win the total height of each boom and thus provide comprehensive pumping coverage.

    Technical data

    Country:

    Portugal

    Type of construction:

    Civil

    Segment type:

    Power plants

    Year:

    2010

    Cubic meters:

    9.000

  • Description

    For the dimensions of the structure, we installed intermediate pumping devices among those receiving concrete in the existing pier. For this, we installed on a barge distributing booms that are connected to the pipe coming from the pier, and in turn connects directly to the concrete distribution devices.

    Technical data

    Country:

    Spain

    Type of construction:

    Civil

    Segment type:

    Ports

    Year:

    2005

    Cubic meters:

    120.000

  • Description

    This is about the pumping of concrete of an isolated exempt dock in the Bay of Algeciras, for which we installed on a self-propelled device the complete pumping equipment consisting of: 3 static concrete vats, 3 fixed mixers, 2 hydraulic mixers, 2 static pumping machines, and one distributing lever of 32 m on a 6 m square shaft. Thus we loaded with concrete all equipment on the existing pier and poured it over the superstructure.

    Technical data

    Country:

    Spain

    Type of construction:

    Civil

    Segment type:

    Ports

    Year:

    2007 / 2008 / 2009

    Cubic meters:

    100.000

  • Description

    The action consist smainly in eliminating, to the extent possible, the roundabouts of the A-7 with the burying of the trunk of the highway with a 1075 meters tunnel. It will begin southwest of San Pedro, until the end of the outskirts of the town of Puerto Banús, in a stretch of 5.950 meters. In addition to the tunnel, it also involves establishing a central measure, reducing and reacting the existing entrances and constructing service roads. The budget is EUR 68.6 million.

    Technical data

    Country:

    Spain

    Type of construction:

    Civil

    Segment type:

    Roads

    Year:

    2008

    Cubic meters:

    70.000

  • Description

    The stretch Lindín – Mondoñedo, of the Cantábrico A-8 highway, is included in the Galician stretch of the A-8, which extends between the villages of Ribadeo and Baamonte, in the province of Lugo, with a length of 5.50 km, has three overpasses, two viaducts and one underpass.

    Technical data

    Country:

    Spain

    Type of construction:

    Civil

    Segment type:

    Roads

    Year:

    2009 / 2010 / 2011 / 2012 / 2013

    Cubic meters:

    75.575

  • Description

    Kraków Balice international airport is one of the most important airports in Poland. We took part in the construction of the 5 storey car park containing 600 spaces for car-parking and 15 spaces for buses.

    Technical data

    Country:

    Poland

    Type of construction:

    Non-residential

    Segment type:

    Parking’s

    Year:

    2009

    Cubic meters:

    20.000