Isla de la Cartuja Tower, Seville

27 | 02 | 2013

Concrete Pumping by static equipment. The static equipment was located at level 0, through horizontal and vertical pipe connected to the hydraulic distributor installed at the climbing system, this way, the distributor raises with this system 180 meters.

 
 
 
Contact us
 
  • Gebomsa News

    Subscribe and we will keep you informed of the latest market news.