27 | 02 | 2013
Concrete Pumping and static pipe bomb for paving 30 cm high in a tunnel beneath the river Vistula. The tunnel was 1,300 m in length, so pumping was conducted in two phases, the first a part of the river with a 700m line and another from the other side of the river with 600m of pipe.