Construction of the largest shopping center in southern Tejo. This center will be located in Setúbal and consist of shops, recreational facilities and restaurants.
Concrete pumping performed by truck-mounted pumps.
Country:
Portugal
Type of construction:
Non-residential
Segment type:
Shopping malls
Year:
2012 / 2013
Cubic meters:
65.000

Concrete Pumping by static equipment. The static equipment was located at level 0, through tow lines of horizontal and vertical pipe, connected to the hydraulic distributor dealers, first with a range of 30m, and the other one with 32m, installed, each on shafts lattice of 30 and 15 m. According to this , we can pump up to level 0 as the peak height.
Country:
Switzerland
Type of construction:
Non-residential
Segment type:
Shopping malls
Year:
2010 / 2011 / 2012 / 2013
Cubic meters:
120.000


The construction of the Las Cancelas Shopping Center was resumed in 2011 and in a six-month period we had to pump more than 30,000 m3 of concrete in paving, foundations and structures, plans with more than 1.500 m2 of reticular floor at one time, a majestic shopping center in the area La Puerta del Camino de Santiago de Compostela.
Country:
Spain
Type of construction:
Non-residential
Segment type:
Shopping malls
Year:
2011
Cubic meters:
32.500
![]()
![]()
The shopping and leisure center El Rosal is the first shopping center of Ponferrada, located in the residential area of La Rosaleda with 143 stores and with 2.500 free parking spaces. El Rosal has more than 49.000 m2 distributed in fashion shops, restaurants, movie theatres and various entertainment venues.
Country:
Spain
Type of construction:
Non-residential
Segment type:
Shopping malls
Year:
2006 / 2007
Cubic meters:
60.000
![]()