• Description

    Construction of Portugal’s most advanced data centre in Covilhã. This data center incorporates the latest technologies and positions Portugal as an innovative and efficient country capable of hosting and managing data through its IT infrastructure and Cloud Computing. This data center is arranged in 4 blocks plus one support block, with a total area of 75,500m². This infrastructure includes 24 12,000 m² rooms. Concrete pumping performed by truck-mounted pumps.

    Technical data

    Country:

    Portugal

    Type of construction:

    Non-residential

    Segment type:

    Administrative centers

    Year:

    2012 / 2013

    Cubic meters:

    35.000

  • Description

    Construction of the largest shopping center in southern Tejo. This center will be located in Setúbal and consist of shops, recreational facilities and restaurants.

    Concrete pumping performed by truck-mounted pumps.

    Technical data

    Country:

    Portugal

    Type of construction:

    Non-residential

    Segment type:

    Shopping malls

    Year:

    2012 / 2013

    Cubic meters:

    65.000

  • Description

    Installation of wind turbines in the Prados wind farm. This wind farm supplies power to the towns of Guardia and Celorico da Beira. The project involves the installation of 17 wind turbines in order to increase electricity production in Freguesias de Prados e Rapa (concelho de Celorico da Beira) e Videmonte, Vila Soeiro, Mizarela, Aldeia Viçosa, Pero Soares e Maçainhas (concelho da Guarda). Concrete pumping performed by truck-mounted pumps.

    Technical data

    Country:

    Portugal

    Type of construction:

    Civil

    Segment type:

    Power plants

    Year:

    2013

    Cubic meters:

    7.500

  • Description

    The structure of the tank rises through a climbing platform system, by which we placed 3 42 booms on shafts we connected each one to its stationary pumping equipment, so that as the height of the wall of the tank increases, we incorporated new stretches of shaft to win the total height of each boom and thus provide comprehensive pumping coverage.

    Technical data

    Country:

    Portugal

    Type of construction:

    Civil

    Segment type:

    Power plants

    Year:

    2010

    Cubic meters:

    9.000

  • Description

    This major work of infrastructure starts near Vila Real and develops at a distance of 120 km up to Bragança. It consists of a diverse set of viaducts, unevenness and hydraulic steps, of which to be pointed out the great Corgo viaduct due to its length and height.

    Eight pumps will be participating in all these works, of which four with a 42-meter boom.

    Technical data

    Country:

    Portugal

    Type of construction:

    Civil

    Segment type:

    Roads

    Year:

    2010 / 2011 / 2012

    Cubic meters:

    380.000

  • Description

    This work consists of a road that develops to the North of the famous Marão tunnel, thus enabling the link between the IP4 and the Via Transmontana (Transmontana road). The work consists of five viaducts, of which two to be pointed out due to their size; the viaduct near Amarante and the viaduct over the Sorgo.

    In these last two, the pumping was carried out using stationary equipment and pipe.

    Technical data

    Country:

    Portugal

    Type of construction:

    Civil

    Segment type:

    Roads

    Year:

    2011 / 2012

    Cubic meters:

    170.000

  • Description

    Este trabajo consistió en la reestructuración de la ZonaSul del Tejo, conexión Trafaria / Barreiro. En este trabajo Gebomsa participó en el bombeo del viaducto de Coina (80.000m3), y los viaductos de Belverde y  Palhais (40.000m3).

    Technical data

    Country:

    Portugal

    Type of construction:

    Civil

    Segment type:

    Roads

    Year:

    2010 / 2011 / 2012

    Cubic meters:

    120.000

  • Description

    This work consisted of the roadway restructuring of 270 km, of which 240 km were made new. Developed in the area of Trás-os-Montes, this work was carried out by sections. The pumping work coincided with the construction of viaducts and passages to unevenness and several minor infrastructure.

    This work was completed in January 2012.

    Technical data

    Country:

    Portugal

    Type of construction:

    Civil

    Segment type:

    Roads

    Year:

    2010 / 2011 / 2012

    Cubic meters:

    130.000