15 | 06 | 2012
This is about the pumping of concrete of an isolated exempt dock in the Bay of Algeciras, for which we installed on a self-propelled device the complete pumping equipment consisting of: 3 static concrete vats, 3 fixed mixers, 2 hydraulic mixers, 2 static pumping machines, and one distributing lever of 32 m on a 6 m square shaft. Thus we loaded with concrete all equipment on the existing pier and poured it over the superstructure.