Concrete Pumping by static equipment. The static equipment was located at level 0, through tow lines of horizontal and vertical pipe, connected to the hydraulic distributor dealers, first with a range of 30m, and the other one with 32m, installed, each on shafts lattice of 30 and 15 m. According to this , we can pump up to level 0 as the peak height.
Country:
Switzerland
Type of construction:
Non-residential
Segment type:
Shopping malls
Year:
2010 / 2011 / 2012 / 2013
Cubic meters:
120.000


These are the construction works of the so-called Valladolid railway complex, located in the Páramo of San Isidro and which will host the current Renfe-Integria workshops and other facilities such as the new goods station, the Technology Center of Vía y Redalsa.The UTE Valladolid railway complex is formed by the companies Comsa, Collosa and Cycasa, with a budget of 140 million euros.
Country:
Spain
Type of construction:
Civil
Segment type:
Railways
Year:
2010 / 2011
Cubic meters:
50.000
![]()
Highway VA-30. Outer Round East of Valladolid. Stretch: Autovía del Duero (A-11) – Autovía of Castile (A-62), at a 22.5 kilometers distance from this new ring road and with a budget of 96.577.560 € . The infrastructure will involve the construction of two new bridges to save the Pisuerga in Arroyo, where the VA-30 starts, and between the exits of the A-62 up to Cigales and Cabezón, where it leads into.
Country:
Spain
Type of construction:
Civil
Segment type:
Roads
Year:
2010 / 2011
Cubic meters:
15.000
![]()
![]()
The structure of the tank rises through a climbing platform system, by which we placed 3 42 booms on shafts we connected each one to its stationary pumping equipment, so that as the height of the wall of the tank increases, we incorporated new stretches of shaft to win the total height of each boom and thus provide comprehensive pumping coverage.
Country:
Portugal
Type of construction:
Civil
Segment type:
Power plants
Year:
2010
Cubic meters:
9.000
![]()
![]()
![]()
![]()
The stretch Lindín – Mondoñedo, of the Cantábrico A-8 highway, is included in the Galician stretch of the A-8, which extends between the villages of Ribadeo and Baamonte, in the province of Lugo, with a length of 5.50 km, has three overpasses, two viaducts and one underpass.
Country:
Spain
Type of construction:
Civil
Segment type:
Roads
Year:
2009 / 2010 / 2011 / 2012 / 2013
Cubic meters:
75.575
![]()
![]()
![]()
During the modernisation of the water supply network in Łódź we had to use 250 m of the pipeline in the circular section tunnel (170 cm in diameter) to pump 30 cm of concrete with the object of widening the water conduct. This tunnel was 800 m in length.
Country:
Poland
Type of construction:
Civil
Segment type:
Hydraulic works
Year:
2010
Cubic meters:
20.000
![]()
![]()
The Sky Tower is the tallest building in Poland. It is 250 m high. To pump the concrete for the walls and the elevator shafts we had to use, further to the pump, a hydraulic distributing lever.
Country:
Poland
Type of construction:
Non-residential
Segment type:
Administrative centers
Year:
2009 / 2010
Cubic meters:
25.000
![]()
![]()
The national music forum will be a cultural and musical center. The idea of this project is to create a site where you can go to the philharmonic, the orchestra, the opera or the theatre. The plan is that this building starts working in 2013.
Country:
Poland
Type of construction:
Non-residential
Segment type:
Administrative centers
Year:
2010 / 2011 / 2012 / 2013
Cubic meters:
165.000
![]()
![]()
Reconstruction of the old railway station in Wrocław and all the technical infrastructure. The objective of this project is to restore the station’s look before the war. The station has to work during this work. We have to use the 200 m long pipe to supply concrete from the entrance to the platforms.
Country:
Poland
Type of construction:
Civil
Segment type:
Railways
Year:
2010 / 2011 / 2012
Cubic meters:
80000
![]()
![]()
This major work of infrastructure starts near Vila Real and develops at a distance of 120 km up to Bragança. It consists of a diverse set of viaducts, unevenness and hydraulic steps, of which to be pointed out the great Corgo viaduct due to its length and height.
Eight pumps will be participating in all these works, of which four with a 42-meter boom.
Country:
Portugal
Type of construction:
Civil
Segment type:
Roads
Year:
2010 / 2011 / 2012
Cubic meters:
380.000
![]()
![]()
Este trabajo consistió en la reestructuración de la ZonaSul del Tejo, conexión Trafaria / Barreiro. En este trabajo Gebomsa participó en el bombeo del viaducto de Coina (80.000m3), y los viaductos de Belverde y Palhais (40.000m3).
Country:
Portugal
Type of construction:
Civil
Segment type:
Roads
Year:
2010 / 2011 / 2012
Cubic meters:
120.000
![]()
![]()
![]()
This work consisted of the roadway restructuring of 270 km, of which 240 km were made new. Developed in the area of Trás-os-Montes, this work was carried out by sections. The pumping work coincided with the construction of viaducts and passages to unevenness and several minor infrastructure.
This work was completed in January 2012.
Country:
Portugal
Type of construction:
Civil
Segment type:
Roads
Year:
2010 / 2011 / 2012
Cubic meters:
130.000
![]()
![]()