15 | 06 | 2012
Pumping of concrete by stationary equipment for a 80 m high tower. For this tower, at an altitude 48 over the top of the two inner walls, an adaptation platform is installed with 4 sections of stems over which we incorporated a stylus of 20m, giving total coverage of the pumping up to the final height of the tower.