Construction of a 7-storey office building in the central district of Mokotow, Warsaw.
Gebomsa planned and executed all the concrete pumping of the project based on the needs of the client.
Pumping was performed using truck-mounted pumps.
Country:
Spain
Type of construction:
Non-residential
Segment type:
Administrative centers
Year:
2013
Cubic meters:
30.000
Construction of Portugal’s most advanced data centre in Covilhã. This data center incorporates the latest technologies and positions Portugal as an innovative and efficient country capable of hosting and managing data through its IT infrastructure and Cloud Computing. This data center is arranged in 4 blocks plus one support block, with a total area of 75,500m². This infrastructure includes 24 12,000 m² rooms. Concrete pumping performed by truck-mounted pumps.
Country:
Portugal
Type of construction:
Non-residential
Segment type:
Administrative centers
Year:
2012 / 2013
Cubic meters:
35.000
Construction of the largest shopping center in southern Tejo. This center will be located in Setúbal and consist of shops, recreational facilities and restaurants.
Concrete pumping performed by truck-mounted pumps.
Country:
Portugal
Type of construction:
Non-residential
Segment type:
Shopping malls
Year:
2012 / 2013
Cubic meters:
65.000
Construction of new Bank of Mozambique facilities in Maputo. The new facilities consist of a 28-storey central tower and two adjoining wings. Pumping performed by truck-mounted pumps.
Country:
Mozambique
Type of construction:
Non-residential
Segment type:
Administrative centers
Year:
2013 / 2014
Cubic meters:
120.000
In its plan to expand its network of public hospitals, the Government of Chile has intensified the construction and expansion of hospitals in the metropolitan area. One of these is the Félix Bulnes hospital extension. The work requires a wide-range telescopic pumping unit to cover all pumping needs, so Gebomsa provides the services with the truck-mounted pump with the widest boom range it possesses in Chile. The efficiency of this unit is unbeatable as it is capable pumping all the structural elements the work requires.
Country:
Chile
Type of construction:
Non-residential
Segment type:
Health centers
Year:
2013 / 2014
Cubic meters:
18.000
Google has started operating in Chile with a major project involving the construction of buildings to house the company’s servers in Latin America. This involves concreting various elements on site, overcoming barriers such as the complexity of access. Gebomsa is actively involved in the pumping of the interior slabs of the buildings with a large capacity stationary unit and the design of piping in order to fill the gaps that hinder the progress of the work. The pumping of this work was performed with truck-mounted pumps and static units.
Country:
Chile
Type of construction:
Non-residential
Segment type:
Administrative centers
Year:
2013 / 2014
Cubic meters:
12.000
Concrete Pumping by static equipment. The static equipment was located at level 0, through tow lines of horizontal and vertical pipe, connected to the hydraulic distributor dealers, first with a range of 30m, and the other one with 32m, installed, each on shafts lattice of 30 and 15 m. According to this , we can pump up to level 0 as the peak height.
Country:
Switzerland
Type of construction:
Non-residential
Segment type:
Shopping malls
Year:
2010 / 2011 / 2012 / 2013
Cubic meters:
120.000
Concrete Pumping by static equipment. The static equipment was located at level 0, through horizontal and vertical pipe connected to the hydraulic distributor installed at the climbing system, this way, the distributor raises with this system 180 meters.
Country:
Spain
Type of construction:
Non-residential
Segment type:
Administrative centers
Year:
2011 / 2012
Cubic meters:
15.000
The construction of the Las Cancelas Shopping Center was resumed in 2011 and in a six-month period we had to pump more than 30,000 m3 of concrete in paving, foundations and structures, plans with more than 1.500 m2 of reticular floor at one time, a majestic shopping center in the area La Puerta del Camino de Santiago de Compostela.
Country:
Spain
Type of construction:
Non-residential
Segment type:
Shopping malls
Year:
2011
Cubic meters:
32.500
The shopping and leisure center El Rosal is the first shopping center of Ponferrada, located in the residential area of La Rosaleda with 143 stores and with 2.500 free parking spaces. El Rosal has more than 49.000 m2 distributed in fashion shops, restaurants, movie theatres and various entertainment venues.
Country:
Spain
Type of construction:
Non-residential
Segment type:
Shopping malls
Year:
2006 / 2007
Cubic meters:
60.000
The parking located in the seminary of the Rondilla will have 890 parking places available. This will be the largest car park built in the city so far, located in the courtyard of the seminary, at the confluence of Mirabel with Tirso de Molina. The garage will have one entry and exit for vehicles and four for pedestrians, all in Mirabel. The three basements will each have a surface of 6.589 square meters.
Country:
Spain
Type of construction:
Non-residential
Segment type:
Parking’s
Year:
2006
Cubic meters:
5.000
Pumping of concrete by static equipment. At level 0 we located the stationary pumping equipment, and through a horizontal and vertical pipeline we connected it to the stylus installed at the ccostumer (REPSOL, CRISTAL) independent climbing system (ESPACIO) reaching heights of up to 250 m. Thus we adapt the typology to costumer in concrete of towers structure.
Country:
Spain
Type of construction:
Non-residential
Segment type:
Administrative centers
Year:
2006 / 2007 / 2008
Cubic meters:
60.000
Kraków Balice international airport is one of the most important airports in Poland. We took part in the construction of the 5 storey car park containing 600 spaces for car-parking and 15 spaces for buses.
Country:
Poland
Type of construction:
Non-residential
Segment type:
Parking’s
Year:
2009
Cubic meters:
20.000
The Sky Tower is the tallest building in Poland. It is 250 m high. To pump the concrete for the walls and the elevator shafts we had to use, further to the pump, a hydraulic distributing lever.
Country:
Poland
Type of construction:
Non-residential
Segment type:
Administrative centers
Year:
2009 / 2010
Cubic meters:
25.000
The national music forum will be a cultural and musical center. The idea of this project is to create a site where you can go to the philharmonic, the orchestra, the opera or the theatre. The plan is that this building starts working in 2013.
Country:
Poland
Type of construction:
Non-residential
Segment type:
Administrative centers
Year:
2010 / 2011 / 2012 / 2013
Cubic meters: